Single-phase IoT Smart Electricity meter(Type DDZY2397)
- Product introduction
DDZY2397 single-phase charge control intelligent electric energy meter is a fully digital intelligent electric energy meter developed by our company. Adopt SOC high integration chip. In addition to the active electric energy metering function, it also has a variety of functions such as online power display, intelligent power theft prevention, overload control, remote centralized meter reading, etc.
- Details
-
The intelligent electricity meter has the functions of electric energy measurement, power parameter measurement, time-sharing measurement, real-time freezing, on-off control, LoRaWAN and RS485 communication etc, which is suitable for single-phase power consumption occasions.
THE MAJOR TECHNICAL INDEXES
Qualification
Single phase direct table
Standards
IEC62053-21, IEC62052-11, DL/T645-2007
Rated voltage un
220V
Operating voltage range
80% Un ~115% Un
Rated current limit ib
5A
Maximum current: Imax
80A
Starting current
0.4% Ib
Power grid frequency
50Hz
Frequency range
±2%
Active measurement accuracy
Class B / 1
Reactive measurement accuracy
Level 2
Active pulse constant
1600(imp/kWh)
Reactive pulse constant
1600(imp/kvarh)
Clock precision
±0.5S/d (23℃)
Normal operating temperature range
-25℃~+55℃
Extreme operating temperature range
-40℃~+70℃
Transportation and storage temperature range
-40℃~+70℃
Power dissipation
<1.5W 、10VA
The time that the blackout clock preserves
>24h
The RS485 interface
The default 2400bps, 1200bps, 2400bps, 4800bps, and 9600bps are optional
LoraWan frequency
LoRaWAN:CN470,RU864,IN865,EU868,US/AU915,KR920,AS923_1/2/3/4,Custom Channels
THE PRINCIPLE FUNCTIONS
1.It has measure forward and reverse active energy functions. Electrical energy should be accumulated and stored separately for electric energy and total electrical energy at each time period such as tips, peaks, flats, and valleys. And it can also store and display the power of the previous 12 months.
2.It can measure,store and display the voltage, current, power, power factor, frequency and other operating parameters and status of the current electricity meter. And it has overload protection function.
3.There are two sets of rates (sharp, peak, flat, valley) and periods that can be programmed arbitrarily, and another set of rates and periods can be start to used at the set time point. Each set of rate time periods can be set with at least 2 time zones for a year. At least 14 time periods can be set within 24 hours. The minimum time period interval is 15 minutes. The time period can be set across zero points.
4.It has freezing functions such as instantaneous freezing, regular freezing, daily freezing, agreed freezing and hour freezing.
5.It has the function of event recording such as zero clearing, programming, proofread, power down, pulling and closing the brake, etc.
6.Remote disconnection and power transmission function. Power off command is issued through communication interface such as RS485 to cut off the user's load loop; Or issue a power transmission instruction to turn on the user load loop.
7.Active upload / bidirectional transparent transmission function. Actively upload the data to the corresponding platform through the LoRaWAN wireless network, with a default interval of 4 hours (settable).
8.After the meter is powered on and the LoRaWAN module is connected to the network, the meter is automatically calibrated.
OPERATION DECLARATION
Status indicator lamp
· The electricity meter uses a bright, long-life LED as a pulse indicator light.
· It has active power pulse indicator light: red, usually go out, flashing when measuring active power.
· LoRaWAN/NB-I o T/C at.1 Module status indicator: green. Always on indicates online, and flashing indicates going online.
Wiring diagram
Of these, 5,6 are reactive pulse output. 7,8 are active pulse output. 9,10 are multifunctional clock output. And 11,12 are RS485 output.
Installation drawing (unit: mm)
Installation
Live installation of wiring is strictly prohibited!
The electricity meter shall be installed indoors as far as possible. Special instrument box protection shall be used for outdoor installation. The installation bottom plate shall be fixed on the wall with strong fire resistance and not easy to vibration. There must be no corrosive gases in the surrounding air where the meter is installed. Avoid dust, salt spray, etc.
When using the electricity meter, the wiring must be conducted strictly according to the wiring diagram in the tail cover of the meter. It is recommended to use copper wire for the lead connected to the terminal seat. The screws of the fixed lead in the terminal seat should be tightened to avoid burning the electricity meter due to bad contact and heating.